Our windows arrived today, and will start beginning installed this weekend !!
We ordered all of our doors yesterday.
http://www.lemieuxdoors.com/
17 internal doors, all wood, historic 5 panel (C55)
2 double closet doors, 5 panel
1 bifold set for laundry, 5 panel
1 double french door with 15 light (1515)
3 exterior doors made of stain grade fur with insulated glass
rear exterior to porch (2081)
front exterior to porch (501)
front vestibule door (2081)
All rough framing, plumbing, HVAC, and Electrical will be complete by next friday for inspections !!!!!!
We are saving some money by doing the low voltage wiring ourselves. That means intercom/door bell, speakers, video, and security. The electrician is wiring each room with phone,data,and coax cable, but we are doing everything else. We'll probably have a system that we can access and control over the internet, by turning off alarm, viewing a video camera, etc. The system will call up to 4 numbers when alarm goes off, so we can get calls right to our mobile phone. Now we just have to put conduit up to a point that isn't accessible to the ground without a ladder... why.. well a perp could just cut the lines before going in.. sure, the alarm would go off, but no calls could go out.
No comments:
Post a Comment